Archive for: Mangere bridge

SH20 Airport Route Changes

SH20 Airport Route Changes

Significant changes to Auckland’s SH20 and the Walmsley Road on ramp at Mangere Bridge from Monday. The additional third southbound lane under the Walmsley Road...

Read Full Story »

 
SH20 Lane Closure Next Week

SH20 Lane Closure Next Week

The NZTA will close a section of the southbound lanes on SH20 next Monday and Tuesday night for work associated with improvements to the Walmsley Road interchange...

Read Full Story »

 
Manukau Harbour Cycleway To Open

Manukau Harbour Cycleway To Open

New sections of cycle and walk ways constructed as part of NZTA’s  Manukau Harbour Crossing project will be officially opened this Sunday by transport minister...

Read Full Story »

 
Manuaku Project Wins Award

Manuaku Project Wins Award

NZTA and its partners on the Manukau Harbour Crossing project have beaten off 15 other contenders to win one of Australasia’s top industry award for excellence. The...

Read Full Story »

 
Old Bridge Replacement Dropped

Old Bridge Replacement Dropped

A proposal to replace the old Mangere Pedestrian Bridge is not proceeding at his stage. The Onehunga enhancement society says it worked closely with NZTA and the...

Read Full Story »

 
Rain May Affect Mangere

Rain May Affect Mangere

The weather will dictate if the new Mangere bridge will open to some traffic tomorrow morning. NZTA and those involved in the project are completing final preparations...

Read Full Story »

 
Walk,Cycle Mangere Bridge
 
Airport Rail: Include Mangere

Airport Rail: Include Mangere

Today’s ARC transport and urban development committee had no hesitation in moving forward on Auckland airport rail but some councillors emphasised it should...

Read Full Story »

 
Pouring Down

Pouring Down

The final concrete closure pour on the new Mangere Bridge was successful last night. This means the bridge will be one continuous piece of infrastructure 650 metres...

Read Full Story »

 
Mangere Bridge Milestone

Mangere Bridge Milestone

The final concrete closure pour on the new Mangere Bridge happens tomorrow night. This means the bridge will be one continuous piece of infrastructure 650 metres...

Read Full Story »

 
Mangere Bridge Extra Lane

Mangere Bridge Extra Lane

NZTA is increasing capacity for northbound drivers on the by providing an additional third lane on the existing Mangere Bridge. “We anticipate the change will...

Read Full Story »

 
The Big SH20 Pylon Drop: Up Close Photos

The Big SH20 Pylon Drop: Up Close Photos

There has been considerable interest in the 35-metre steel pylon erected at the site of the new Beachcroft Avenue foot bridge over the Southwestern Motorway (SH20)...

Read Full Story »

 
Mighty Steel Pylon Over SH20 Tonight

Mighty Steel Pylon Over SH20 Tonight

A 35-metre steel pylon will be erected overnight at the site of the new Beachcroft Avenue foot bridge over the Southwestern Motorway (SH20) at Onehunga. The pylon...

Read Full Story »

 
Deck Segments Being Installed For New Mangere Bridge

Deck Segments Being Installed For New Mangere Bridge

Mangere bridge lift | NZTA From tomorrow, there will be nightly closures of Onehunga Harbour Road, for installation of deck segments for the new Mangere Bridge. Onehunga...

Read Full Story »

 
The Amazing Big Bridge Lift (Photos)

The Amazing Big Bridge Lift (Photos)

As posted the other day, there was to be an amazing spectacle on the Mangere bridge project on Friday night when two of the country’s largest cranes worked in...

Read Full Story »